Check the exact area you plan to visit, the access road, the day’s warnings and a way home before choosing a route.
Practical guides · Settling in and public services · In-depth article
Received a Western Power vegetation notice? Check the deadline and who should act
Read the notice for the tree, line and responsible party. Arrange a qualified arborist for routine work and report damaged lines as an emergency.
Based on: www.westernpower.com.au; retrieved: 2026-11-20.
You have a Vegetation Notice in Western Power’s network area. Check which tree and line it refers to and the date it gives. Western Power inspects overhead network lines and the overhead service line to a property. An occupier, landowner or council may receive a notice. Use it to establish who needs to arrange the work. [S1] [S2]
A damaged or fallen line needs an immediate report
Treat damaged or fallen powerlines as live. Keep people at a safe distance and stay at least eight metres away from a damaged or fallen line. Call the 24-hour number on Western Power’s damaged powerline page straight away. Call 000 if life is in danger. Stay away from trees or branches caught on a line and wait for professionals to make the area safe. [S3]
Check these details on a routine notice
Detail | What to do |
|---|---|
Address, tree location and due date | Identify the location from somewhere safe. Western Power’s notice process generally allows 40 days to complete the work. Check the date in the notice itself. |
Responsible party | If you rent, send the notice to the landlord or agent and ask who will arrange the contractor. Check with the issuer if it concerns a street tree or a neighbouring property. |
Qualified work | Engage a qualified arborist who can work around powerlines. Show them the notice so they can assess the job and safety requirements. |
Keep the notice and the record of the work
Say the notice concerns a branch near the overhead service line to your home. Pass it to the person arranging the work, confirm the contractor is qualified for the job and record the completion date. Follow-up differs for service lines and street lines. Quote the notice reference when checking responsibility or timing with Western Power. [S1] [S2]
Comments
Share a related experience or ask about the article
No comments yet. Ask a question about the article.
Sign in to discussKeep the discussion about the content. Do not post private information or advertisements.