Sort out contact, a small grocery shop and a real return trip before committing to more expensive services.
Practical guides · Settling in and public services · In-depth article
Renting and upgrading to nbn full fibre? What to check before the technician comes
Get the landlord’s permission, arrange access and agree where the boxes and cable can go. Confirm activation with your provider before dealing with your old service.
Based on: www.nbnco.com.au; retrieved: 2026-11-20.
Your provider says the nbn connection at your rental can be upgraded to full fibre, or FTTP. Tell it you rent and obtain your landlord’s permission before installation. The work can involve drilling and sometimes digging. A flat or a group of units on one lot may follow a different process, so ask your provider which one applies to your address. [S1] [S2]
Settle access and permission before the appointment
Ask the landlord or agent to confirm in writing what work they agree to. If shared access or an external wall is involved, check who can approve the work and let the technician in.
Confirm the address, date and time window with your provider. Have an adult present who can agree to the plan and sign off. Clear the areas the technician will need and secure pets. [S1]
Walk through the proposed route before signing
Part of the job | Question for the technician |
|---|---|
Outdoor equipment and cable | Where does the cable enter? What walls or pathways will it use, and will there be drilling or digging? |
Indoor connection box | Where is there a suitable place and power? Point out your current router and ask what will work. |
The proposed route goes beyond the agreed work | Ask whether there is a route within the permission you have. Check who needs to arrange extra permission or cabling and whether another visit is needed. |
Say you want the connection box in the study but the technician can reach only the entry area with the available route. Ask them to show you the position and cable route before you sign. If you need different cabling, check the options and possible costs with your provider. [S1] [S2]
Check the new connection when your provider activates it
After installation, wait for your provider to confirm activation. If you already have nbn, you can generally use the existing service while you wait, though the installation may interrupt it briefly. Keep the appointment record, installation details and activation notice. Once the new connection works, ask your provider whether the old plan switches over or needs a separate cancellation. [S1]
Comments
Share a related experience or ask about the article
No comments yet. Ask a question about the article.
Sign in to discussKeep the discussion about the content. Do not post private information or advertisements.